Höllbachbrücke Plasselbschlund

19.06.2014

Line

The shell of the new Höllbach Bridge has been completed. The roadway will have to withstand 40 tons; this much is needed for the heavy timber transporters in the Höllbach area.

The old Höllbach Bridge was destroyed by arson at the beginning of January 2013. To this day, perpetration and motive are unknown. The bridge was built in 1939 and was a symbol for the then ongoing reforestation in the Plasselbschlund. It also formed the language and district border between the Sense and Gruyères districts. This is to be expressed on the new bridge - probably in the form of an inscription.

 
 
 

Switzerland:

Thun Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Niesenstrasse 1, 3600 Thun

Tel: +41 58 255 15 10

thun@timbatec.ch


Zürich Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Ausstellungsstrasse 36, 8005 Zürich

Tel: +41 58 255 15 20

zuerich@timbatec.ch


Delémont Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Avenue de la Gare 49, 2800 Delémont 

+41 58 255 15 40 

delemont@timbatec.ch


Bern Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Falkenplatz 1, 3012 Bern

Tel: +41 58 255 15 30

bern@timbatec.ch

Austria:

Headquarters Vienna (A) 

Timbatec Timber Construction Engineers GmbH
Im Werd 6/31a, 1020 Wien 
Tel: +43 720 2733 01

wien@timbatec.at


Impressum

Follow us: