Housing Estate Toblerstrasse 


2017, Zürich-Fluntern

 The Zürichberg housing estate captivates with its unusual architecture: 13 compact solitary buildings with a triangular ground plan, which create cabinet-like exterior spaces through their rotated and offset arrangement.

 

Residential building sue&til 


2019, Winterthur

 sue&til: The currently largest wooden residential building in Switzerland contains 307 apartments, a mixed-use ground floor and 200 parking lots. The 6-storey building is a flagship project for timber construction in Switzerland.

 

School Complex Chrüzacher 


2017, Bassersdorf

 At the initiative of Timbatec, the new school complex in Bassersdorf produced even more timber than planned. Originally, only the walls of the gym were to be made of timber, but the roof of concrete. Timbatec also proposed to build the roof in timber construction in order to save costs.

 

The Werkhof of the A16 motorway 


2017, Loveresse BE

 Highest precision was required at the Werkhof of the A16 motorway in Loveresse in the Bernese Jura. Due to the enormous mass of the 150 meter long hall, the timber construction elements had to fit exactly.

 

Apartment buildings Wolf and Edelweiss 


2017, Andermatt

 After The Chedi Hotel, Timbatec was awarded another contract in the holiday village Andermatt Reuss. At the two apartment buildings Wolf and Edelweiss, the timber construction engineers were responsible for the statics of the roof construction and for the fire protection of the shingle facade of one residential building.

 

A Residence made entirely of Swiss Timber 


2016, Köniz

 The Arborea residential house in Köniz, which is concealed behind the solidly constructed arcades, is a pure timber construction.

 

MFH Johnsonhaus 


2014, Köniz

 In the heart of the municipality of Köniz, a residential and commercial building on Neuhausplatz has been built in a sunny location close to the center.

 

Hotel The Chedi 


2014, Andermatt

 "Andermatt Swiss Alps" is a year-round holiday destination in the heart of the Swiss Alps. The project comprises six 4 and 5-star hotels, around 500 apartments in 42 buildings and 25 exclusive chalets.

1
2
3
4
5
6
7
8

Timber Grows with You

More and more large buildings are being built with timber as a renewable building material. Timbatec is a leading, innovative company in this growing future market. We construct multi-story buildings, industrial buildings and bridges in timber. And we develop modern timber construction products according to individual requirements.

 
  • DEEPWood research project has started

    DEEPWood research project has started

    06.05.2020 Line

    Timber construction is booming. Through active management and participation in research and development projects, we are part and driver of this development. Together with the Bern University of Applied Sciences, the Lucerne University of Applied Sciences and Arts and the DeepWood implementation team, we are continuing to develop the BIM planning method.

  • School building made of regional wood

    School building made of regional wood

    27.04.2020 Line

    On the Plateau de Diesse above the Lake of Biel, a new wooden schoolhouse will soon be built. Chappuis Architectes SA won the architectural competition and is now planning the new building. Timbatec is currently preparing the tender documents and ensuring that the school building will be built with wood from the communal forests.

  • Swiss wood - now in particular

    Swiss wood - now in particular

    06.04.2020 Line

    Timber construction is booming and the demand for Swiss timber is high. But forest owners fear a collapse of the market because of the current situation. We provide an insight into three projects using regional timber and show how they are affected by the corona virus. Timbatec continues to rely on the natural raw material.

  • Certificate for the "Crocodile"

    Certificate for the "Crocodile"

    03.04.2020 Line

    Timbatec is happy about the certificate of the CO2 Institute. It confirms: The wood used in "Crocodile" has removed 6,418 tons of CO2 from the atmosphere. The large-scale project is thus making its contribution to climate protection.

  • Start of Construction of Wooden Animal Bridge

    Start of Construction of Wooden Animal Bridge

    01.04.2020 Line

    Start of construction for wooden animal bridge To enable animals to cross the A2 highway near Lucerne, the federal government is building a wild animal bridge - made of wood, of course! Preparatory work for the CHF 11 million project began on Monday.

  • Hospital extension with wooden modules

    Hospital extension with wooden modules

    26.03.2020 Line

    The Dornach hospital in the canton of Solothurn is being extended by one floor. This happens during operation. Timbatec expresses its utmost respect for the carpenters of Stamm Bau AG and all the craftsmen working on the construction sites during this difficult time.

  • Stop Corona -  Timbatec Works at Home

    Stop Corona - Timbatec Works at Home

    23.03.2020 Line

    We are in an extraordinary situation. Only by acting together, we can limit the number of serious illnesses and avoid overloading our health system. Timbatec takes responsibility and works in the home office.

  • Innovation Campus in Hellerau - naturally made of wood

    Innovation Campus in Hellerau - naturally made of wood

    24.02.2020 Line

    Deutsche Werkstätten in Hellerau is one of the world's leading companies in the interior design of private residences, yachts and luxury hotels. Their quality standard is correspondingly high. We are looking forward to plan the new campus and to the increasing international projects.

  • New school complex made of wood for the community of Marly

    New school complex made of wood for the community of Marly

    17.02.2020 Line

    The Freiburg community is about to build a new school complex with twelve classrooms, four kindergarten rooms and a double gymnasium. The school complex consists of three Minergie-P- Eco buildings made of wood. Timbatec is planning all timber construction engineering services.

  • TS3 receives U.S. Patent for Face Bonding

    TS3 receives U.S. Patent for Face Bonding

    14.02.2020 Line

    It’s official: TS3 has received the US patent for it’s face bonding technology valid by beginning of 2020. The TS3 technology is the result of ten years of research and development by Timbatec Holzbauingenieure Schweiz AG collaborating with the ETH Zurich and the Bern University of Applied Sciences.

 
 
 

Switzerland:

Thun Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Niesenstrasse 1, 3600 Thun

Tel: +41 58 255 15 10

thun@timbatec.ch


Zürich Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Ausstellungsstrasse 36, 8005 Zürich

Tel: +41 58 255 15 20

zuerich@timbatec.ch


Delémont Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Avenue de la Gare 49, 2800 Delémont 

+41 58 255 15 40 

delemont@timbatec.ch


Bern Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Falkenplatz 1, 3012 Bern

Tel: +41 58 255 15 30

bern@timbatec.ch

Austria:

Headquarters Vienna (A) 

Timbatec Timber Construction Engineers GmbH
Im Werd 6/31a, 1020 Wien 
Tel: +43 720 2733 01

wien@timbatec.at


Impressum

Follow us: