Housing Estate Toblerstrasse 


2017, Zürich-Fluntern

 The Zürichberg housing estate captivates with its unusual architecture: 13 compact solitary buildings with a triangular ground plan, which create cabinet-like exterior spaces through their rotated and offset arrangement.

 

Residential building sue&til 


2019, Winterthur

 sue&til: The currently largest wooden residential building in Switzerland contains 307 apartments, a mixed-use ground floor and 200 parking lots. The 6-storey building is a flagship project for timber construction in Switzerland.

 

School Complex Chrüzacher 


2017, Bassersdorf

 At the initiative of Timbatec, the new school complex in Bassersdorf produced even more timber than planned. Originally, only the walls of the gym were to be made of timber, but the roof of concrete. Timbatec also proposed to build the roof in timber construction in order to save costs.

 

The Werkhof of the A16 motorway 


2017, Loveresse BE

 Highest precision was required at the Werkhof of the A16 motorway in Loveresse in the Bernese Jura. Due to the enormous mass of the 150 meter long hall, the timber construction elements had to fit exactly.

 

Apartment buildings Wolf and Edelweiss 


2017, Andermatt

 After The Chedi Hotel, Timbatec was awarded another contract in the holiday village Andermatt Reuss. At the two apartment buildings Wolf and Edelweiss, the timber construction engineers were responsible for the statics of the roof construction and for the fire protection of the shingle facade of one residential building.

 

A Residence made entirely of Swiss Timber 


2016, Köniz

 The Arborea residential house in Köniz, which is concealed behind the solidly constructed arcades, is a pure timber construction.

 

MFH Johnsonhaus 


2014, Köniz

 In the heart of the municipality of Köniz, a residential and commercial building on Neuhausplatz has been built in a sunny location close to the center.

 

Hotel The Chedi 


2014, Andermatt

 "Andermatt Swiss Alps" is a year-round holiday destination in the heart of the Swiss Alps. The project comprises six 4 and 5-star hotels, around 500 apartments in 42 buildings and 25 exclusive chalets.

1
2
3
4
5
6
7
8

Timber Grows with You

More and more large buildings are being built with timber as a renewable building material. Timbatec is a leading, innovative company in this growing future market. We construct multi-story buildings, industrial buildings and bridges in timber. And we develop modern timber construction products according to individual requirements.

 
  • New Tüfi bridge made of regional beech wood

    New Tüfi bridge made of regional beech wood

    04.11.2020 Line

    The pedestrian and bicycle bridge Tüfi in Adliswil is aging. Analyses have shown that replacing the bridge is almost as expensive as an extensive renovation. Today the new bridge - with beech wood from the surrounding forests - was installed over the Sihl river.

  • Online event at Schilliger Holz

    Online event at Schilliger Holz

    02.11.2020 Line

    The TS3 timber construction technology developed by Timbatec has made the breakthrough. Schilliger Holz is the first official CLT licensee. At an online event, the technology was explained and current projects were presented. Here you can find the recording of the event.

  • Start of the season for HC Ajoie

    Start of the season for HC Ajoie

    02.10.2020 Line

    The Swiss League ice hockey season starts today. For the time being, HC Ajoie will play away games until the new ice stadium - built of wood from the surrounding forests - is inaugurated on November 18, 2020. Here you can already take a virtual tour through the stadium.

  • Alszeile in Vienna is erected

    Alszeile in Vienna is erected

    23.09.2020 Line

    Vienna is growing strongly. By 2023 the city is expected to have two million inhabitants. That needs new living space. Timbatec is committed to more timber construction projects like the Alszeile. In this sustainable project we were responsible for the statics, among other things.

  • Wooden wildlife bridge is erected

    Wooden wildlife bridge is erected

    09.09.2020 Line

    Switzerland's first wildlife bridge made of wood quickly takes shape. The assembly of the wooden beams takes another week. Since 1998 Timbatec has been committed to the realization of such structures from the natural raw material wood. Today it is finally reality!

  • World record: 650m2 large CLT panel

    World record: 650m2 large CLT panel

    07.09.2020 Line

    In the Austrian Tyrol, a timber construction is currently being built with a 650m2 cross laminated timber panel. That is a world record! The TS3 technology makes it possible - a development by Timbatec together with the ETH Zurich and the Bern University of Applied Sciences.

  • New specifications with advantages for wood

    New specifications with advantages for wood

    04.09.2020 Line

    Public procurement law (BöB) has been revised and will enter into force at the beginning of 2021. The BöB and the newly published SIA 101 communication standard demand that sustainability be taken into account over the entire life cycle. This is a clear commitment to wood as a building material.

  • We rely on Swiss timber

    We rely on Swiss timber

    02.09.2020 Line

    Wood is a naturally renewable raw material that only requires solar energy and water for its production. Harvesting and processing take place with very little energy and the material also stores CO2. As a Swiss timber partner, Timbatec is committed to the use of this domestic raw material - also in public tenders.

  • The measurement is the key to success

    The measurement is the key to success

    31.08.2020 Line

    In Birmensdorf, a commercial building is being extended. The extension is connected to the existing neighbouring building with a 35 metre long wooden ramp and serves as a parking deck for motor vehicles. This week the construction work was started with the tachymeter. They are the basis for the detailed planning.

  • Additioning of storeys on a big scale

    Additioning of storeys on a big scale

    27.08.2020 Line

    The former cardboard factory in Deisswil near Bern is beginning a new era. Thanks to the wooden multi-storey top-up and the conversion of the existing factory buildings, a new quarter is created. The wooden elements are currently being assembled.

 
 
 

Switzerland:

Thun Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Niesenstrasse 1, 3600 Thun

Tel: +41 58 255 15 10

thun@timbatec.ch


Zürich Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Ausstellungsstrasse 36, 8005 Zürich

Tel: +41 58 255 15 20

zuerich@timbatec.ch


Delémont Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Avenue de la Gare 49, 2800 Delémont 

+41 58 255 15 40 

delemont@timbatec.ch


Bern Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Falkenplatz 1, 3012 Bern

Tel: +41 58 255 15 30

bern@timbatec.ch

Austria:

Headquarters Vienna (A) 

Timbatec Timber Construction Engineers GmbH
Im Werd 6/31a, 1020 Wien 
Tel: +43 720 2733 01

wien@timbatec.at


Impressum

Follow us: