Höllbach Bridge, Plasselb

2014

The bridge connects the districts of Sense and Gruyères and received a certificate for the use of Swiss wood. The new truss structure with shingle roof replaces the old Höllbach bridge, which was destroyed by arson in 2013.

Facts and images
Construction Data
Involved
Articles
Side view
Side view
Interior view
Interior view
Connection node
Connection node
Portal view
Portal view
Presentation of the CH Wood Certificate
Presentation of the CH Wood Certificate

The project
The new bridge over the Höllbach in the Plasselbschlund was inaugurated on Saturday, July 5, 2014. It weighs 28 tons, is almost 6 meters high, was built from 45 cubic meters of wood and is covered with about 37,000 shingles.

The construction
State Councillor, Mrs. Marie Garnier, as well as other speakers underlined at the inauguration the importance of the fascinating structure: it is a symbol of the reforestation 125 years ago and a central element for today's management of the protection forest. The bridge connects the districts of Sense and Gruyères and received a certificate for the use of Swiss wood. The new truss structure with shingle roof replaces the old Höllbach bridge, which was destroyed by arson in 2013.

CH.HOLZBAU 10.14

Construction Data

- 45 m3 Wood

- 3'000 kg steel

- 37'000 pieces of shingles

- Heavy duty bridge for 40 t truck


Construction costs

- BKP 214: 0.25 Mio.


Services of Timbatec

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- Statics and construction

- SIA Phase 51 Implementation project

- Technical site management and site inspections

Client
Office of Forests, Game and Fisheries
1716 Givisiez


Timberconstructor
Zumwald Neuhaus AG
1719 Zumholz


Timber construction engineer
Timbatec Holzbauingenieure Schweiz AG, Bern
3012 Bern