Housing Estate Toblerstrasse 


2017, Zürich-Fluntern

 The Zürichberg housing estate captivates with its unusual architecture: 13 compact solitary buildings with a triangular ground plan, which create cabinet-like exterior spaces through their rotated and offset arrangement.

 

Residential building sue&til 


2019, Winterthur

 sue&til: The currently largest wooden residential building in Switzerland contains 307 apartments, a mixed-use ground floor and 200 parking lots. The 6-storey building is a flagship project for timber construction in Switzerland.

 

School Complex Chrüzacher 


2017, Bassersdorf

 At the initiative of Timbatec, the new school complex in Bassersdorf produced even more timber than planned. Originally, only the walls of the gym were to be made of timber, but the roof of concrete. Timbatec also proposed to build the roof in timber construction in order to save costs.

 

Autobahn-Werkhof 


2017, Loveresse BE

 Highest precision was required at the Werkhof of the A16 motorway in Loveresse in the Bernese Jura. Due to the enormous mass of the 150 meter long hall, the timber construction elements had to fit exactly.

 

Apartment buildings Wolf and Edelweiss 


2017, Andermatt

 After The Chedi Hotel, Timbatec was awarded another contract in the holiday village Andermatt Reuss. At the two apartment buildings Wolf and Edelweiss, the timber construction engineers were responsible for the statics of the roof construction and for the fire protection of the shingle facade of one residential building.

 

A Residence made entirely of Swiss Timber 


2016, Köniz

 The Arborea residential house in Köniz, which is concealed behind the solidly constructed arcades, is a pure timber construction.

 

MFH Johnsonhaus 


2014, Köniz

 In the heart of the municipality of Köniz, a residential and commercial building on Neuhausplatz has been built in a sunny location close to the center.

 

Hotel The Chedi 


2014, Andermatt

 "Andermatt Swiss Alps" is a year-round holiday destination in the heart of the Swiss Alps. The project comprises six 4 and 5-star hotels, around 500 apartments in 42 buildings and 25 exclusive chalets.

1
2
3
4
5
6
7
8

Timber Grows with You

More and more large buildings are being built with timber as a renewable building material. Timbatec is a leading, innovative company in this growing future market. We construct multi-story buildings, industrial buildings and bridges in timber. And we develop modern timber construction products according to individual requirements.

 
  • Start of Construction of Wooden Animal Bridge

    Start of Construction of Wooden Animal Bridge

    01.04.2020 Line

    Start of construction for wooden animal bridge To enable animals to cross the A2 highway near Lucerne, the federal government is building a wild animal bridge - made of wood, of course! Preparatory work for the CHF 11 million project began on Monday.

  • Hospital extension with wooden modules

    Hospital extension with wooden modules

    26.03.2020 Line

    The Dornach hospital in the canton of Solothurn is being extended by one floor. This happens during operation. Timbatec expresses its utmost respect for the carpenters of Stamm Bau AG and all the craftsmen working on the construction sites during this difficult time.

  • Stop Corona -  Timbatec Works at Home

    Stop Corona - Timbatec Works at Home

    23.03.2020 Line

    We are in an extraordinary situation. Only by acting together, we can limit the number of serious illnesses and avoid overloading our health system. Timbatec takes responsibility and works in the home office.

  • Innovation Campus in Hellerau - naturally made of wood

    Innovation Campus in Hellerau - naturally made of wood

    24.02.2020 Line

    Deutsche Werkstätten in Hellerau is one of the world's leading companies in the interior design of private residences, yachts and luxury hotels. Their quality standard is correspondingly high. We are looking forward to plan the new campus and to the increasing international projects.

  • Additioning of storeys on a big scale

    Additioning of storeys on a big scale

    21.02.2020 Line

    The former cardboard factory in Deisswil near Bern is beginning a new era. Thanks to the wooden multi-storey top-up and the conversion of the existing factory buildings, a new quarter is created. The wooden elements are currently being assembled. Mark the Second of July 2020 for a site aperitif.

  • New school complex made of wood for the community of Marly

    New school complex made of wood for the community of Marly

    17.02.2020 Line

    The Freiburg community is about to build a new school complex with twelve classrooms, four kindergarten rooms and a double gymnasium. The school complex consists of three Minergie-P- Eco buildings made of wood. Timbatec is planning all timber construction engineering services.

  • TS3 receives U.S. Patent for Face Bonding

    TS3 receives U.S. Patent for Face Bonding

    14.02.2020 Line

    It’s official: TS3 has received the US patent for it’s face bonding technology valid by beginning of 2020. The TS3 technology is the result of ten years of research and development by Timbatec Holzbauingenieure Schweiz AG collaborating with the ETH Zurich and the Bern University of Applied Sciences.

  • New ice rink made of Swiss wood for the freshly crowned cup winner

    New ice rink made of Swiss wood for the freshly crowned cup winner

    03.02.2020 Line

    The HC Ajoie is ice hockey cup winner - a whole region is celebrating! Soon the Pruntruter will play in a new stadium made of wood. Thanks to the commitment of all involved and Timbatec's wood flow processes, the new ice hockey stadium is being built from wood from the surrounding community forests.

  • Multi-family house completely made of timber

    Multi-family house completely made of timber

    28.01.2020 Line

    In Berne Bümpliz, the parish of Berne built a new apartment building entirely from wood - including it's elevator shaft and staircase. This week the first tenants are moving into their apartments.

  • Our start-up TS3 AG exhibits at the Swiss Bau

    Our start-up TS3 AG exhibits at the Swiss Bau

    07.01.2020 Line

    Swiss Bau is the leading trade fair for the construction and real estate industry in Switzerland. We look forward to your visit to our stand B96 in hall 1.0, where we will show you how to build large-scale wooden structures with TS3.

 
 
 

Switzerland:

Headquarters

Timbatec Timber Construction Engineers Switzerland Ltd.

Niesenstrasse 1, 3600 Thun

Tel: +41 58 255 15 10

thun@timbatec.ch


Zürich Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Ausstellungsstrasse 36, 8005 Zürich

Tel: +41 58 255 15 20

zuerich@timbatec.ch


Bern Branch

Timbatec Timber Construction Engineers Switzerland Ltd.

Falkenplatz 1, 3012 Bern

Tel: +41 58 255 15 30

bern@timbatec.ch

Austria:

Headquarters Vienna (A) 

Timbatec Timber Construction Engineers GmbH
Im Werd 6/31a, 1020 Wien 
Tel: +43 720 2733 01

wien@timbatec.at


Impressum

 

Minergie
SQS
Mitglied sia