Freeway depot, Loveresse BE

2017
Freeway depot
Freeway depot

The highest precision was required for the workshop on the A16 freeway in Loveresse in the Bernese Jura. The timber construction elements had to fit exactly because of the enormous dimensions of the 150-meter-long hall.

The project

Since 2016, the A16, the Transjurane, has connected the Swiss highway network with that of France. For the maintenance of the southern section of the Transjurane, a large depot was built near Loveresse, replacing several depots.

The workshop was built as a wooden structure in accordance with the energy-saving Minergie-P-Eco standard. Practically only wood from Switzerland was used.

The construction method

The supporting structure above ground consists of a skeleton construction lined with timber frame elements. Glulam columns and purlins are arranged in three longitudinal axes. Ribbed beams run above them in the direction of the shorter building dimension. Horizontal stabilization is provided by planked framed walls that have been arranged in selected bays between the columns

The challenge

The dimensions of the structure required extremely precise planning to accommodate any tolerances. Even slight inaccuracies can add up to deviations of several centimeters over a length of 150 meters. The timber construction elements, which were manufactured with millimeter precision, therefore had to fit exactly onto the prepared concrete foundations. Timbatec planned the filler elements in such a way that construction tolerances are accommodated in these elements between the main supports.

The work yard offers ample space for trucks, snow plows and other vehiclesThe work yard offers ample space for trucks, snow plows and other vehicles
Cross-stacked supporting structure: the roof beams rest on the purlinsCross-stacked supporting structure: the roof beams rest on the purlins
View from the cafeteria, the heart of the Werkhof, to the spacious parking lotView from the cafeteria, the heart of the Werkhof, to the spacious parking lot
The office zone of the Werkhof: Wood was also used for the interior fittings (Photos: Nils Sandmeier)The office zone of the Werkhof: Wood was also used for the interior fittings (Photos: Nils Sandmeier)
Project information
  • - Glulam: 1'125 m3
  • - Frame timber: 110 m3
  • - Three-layer boards: 450 m3
  • - OSB boards: 110 m3
  • - Insulation: 480 m3
Construction costs
  • - BKP  1-9:  CHF 20.8 million
  • - BKP     2:  CHF 15.0 million
  • - BKP 214:   CHF 3.0 million
Design stages
  • - SIA Phases 31 - 51
Design services
  • - Structural Engineering and Analysis
  • - Construction
  • - Building physics and acoustics
Additional Expertise
  • - Technical Construction Management and Site Inspections
  • - Cost estimate
Building owner

AGG Amt für Grundstücke und Gebäude3013 Bern

Architecture

Claudia Meier & Markus Bachmann / MBAA8004 Zürich

Timber construction

PM Mangold Holzbau AG4466 Ormalingen

Construction Management

Tekhne SA1003 Lausanne

Civil engineering

Schnetzer Puskas Ingenieure AG3011 Bern