Temporary restaurant "time out" Cantonal Hospital, Aarau

2020

The new "time out" staff restaurant at the Aarau Cantonal Hospital was built in just eight months. 3D planning and good project management made the fast construction time possible.

Facts and images
Construction Data
Involved
Innenansicht
Innenansicht
Innenraum vor Einrichtung
Innenraum vor Einrichtung
Holzbauplanung und HLKS sind aufeinander abgestimmt
Holzbauplanung und HLKS sind aufeinander abgestimmt
HLKS-Planung im 3-D-Modell
HLKS-Planung im 3-D-Modell

The project
The Cantonal Hospital Aarau is projecting a new building within the existing hospital site, which will replace the existing clinics. Construction activities began in 2019 and will be largely completed by 2023. The existing LeClou staff restaurant will be replaced with a temporary facility designed to operate for 4-5 years.
The new building will be realized between the existing buildings House 1 and House 3. On the 1st floor, the restaurant will offer space for a maximum of 600 people. On the 2nd floor there are storage and ancillary rooms. Below the two main floors are the technical facilities and parking spaces. The building is connected to the neighboring buildings via an elevator in the basement.

The construction method
The building is a post and beam construction with box girder elements both for the ceiling and for the roof. In the transverse direction of the building, large beams are stretched, which stand on columns anchored in the ground with pile foundations.
The challenge
Torealize the planning and works design in such a short time was possible thanks to a good cooperation with the timber constructor and the other specialized planners. This was achieved with an automated correx phase with the 3D models. This new matching possibility saves time for the approval. We also started a pilot project with a new tool of the drawing program, where several employees worked simultaneously on the 3D model. This also saved time.

Construction Data

- hollow box elements 1400 m2

- glued laminated timber 150 m3

- OSB boards 4500 m2


Construction costs

- BKP 1-9: 6 million francs

- BKP 214: 1

- 1 million francs


Services of Timbatec

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

- SIA Phase 52 Execution

- SIA Phase 53 Commissioning

- Statics and construction

- Fire protection planning

- Fire protection Quality assurance QSS2

- Cost estimation

- Works planning 3D and 2D

- Technical site management and site inspections

Architect
Erne AG Holzbau, 5080 Laufenburg


Client
Kantonsspital Aarau AG, 5001 Aarau


Timberconstruction engineer
Timbatec Holzbauingenieure Schweiz AG, 8005 Zurich


Timberconstruction
Erne AG Holzbau, 5080 Laufenburg


Civil engineer
STK Bauingenieure AG, 8802 Kilchberg


Building physics
BAKUS Bauphysik & Akustik GmbH, 8045 Zurich