New construction kiosk swimming pool Wolfensberg, Winterthur

In the swimming pool "Wolfi" in Winterthur the kiosk building was replaced by a new, modern building . Timbatec planned the floor slab, retaining wall, timber construction and fire protection measures.

Facts and images
Construction Data
Involved
The supporting structure remains visible
The supporting structure remains visible
A large canopy for protection from the weather
A large canopy for protection from the weather
Visible construction
Visible construction

The project
In the upper, rear part of the property The kiosk and toilet building is connected to the residential building. With the replacement building, the residential building will be freed, and the kiosk will be created as a separate building. The serving and return area of the new kiosk also faces the pool and has a generously covered seating area. The enclosed area houses the kitchen, dishwashing station, refrigeration units and restroom. Deliveries are made to the rear of the kiosk via two access points. Technical and disposal rooms are located behind the refrigeration cells.

The construction
The floor foundation slab is inserted as a reinforced concrete flat slab flush with the surrounding area as far as possible in height. The wall and column construction are made of cross laminated timber panels and as glulam columns. Also made of glulam, the primary beams are supported over the wall panel and columns. Intermediate beams between the primary beams are made of glulam. The roof boarding is made of a three-layer board. Thus, the whole construction is visible from the outside as well as from the inside.

The challenge
The challenge was to keep the construction as simple as possible, broken down into linear and slab components. The construction method required a small ground clearance, with a focus on rainproofing and weather protection.

Services of Timbatec

- SIA Phase 31 Preliminary design

- SIA Phase 32 Construction project

- SIA Phase 41 Tendering and comparison of offers

- SIA Phase 51 Implementation project

- SIA Phase 52 Execution

- Fire protection planning

- Cost estimation

- Fire protection Quality assurance QSS1

- Technical planning building physics

Client
City of Winterthur
8403 Winterthur


Architect
Bernath + Widmer
8048 Zurich


Timber construction engineer
Timbatec Holzbauingenieure (Schweiz) AG Zurich
8005 Zurich


Photography
Lukas Murer