New construction/renovation of the Mühleareal building complex, Herbligen BE

2009

A five-story apartment building and 2 x 3 row single-family homes are clustered around the existing mill building.

Facts and images
Construction Data
Involved
Mill building renovated
Mill building renovated
Mill before renovation
Mill before renovation
General view
General view

The project
The mill area with the listed mill consisted, like the farms, of very different volumes. Due to the abandonment of the mill and a transitional period without commercial activity, a kind of industrial wasteland was created. A new center for Herbligen was to be built on this industrial wasteland. In an invited competition, the project of Aebi Vincent Architects from Bern prevailed. It unites an ensemble consisting of a five-story apartment building and 2 x 3 terraced single-family houses grouped around the existing mill building.

The construction
The old mill once consisted of a residential and an economic part, united under one roof. In the southern part, the existing apartments were gently converted, while in the northern part modern, clearly structured units were created. In both parts of the building, the attic apartments are duplexes. The original exterior appearance of the mill building was meticulously reconstructed and structurally restored. The construction of the new buildings is made of wood from the first floor upwards. The buildings have Minergie standard and controlled ventilation. Wood-concrete composite ceilings and wood-frame walls are used to achieve the acoustic and fire protection requirements. The base is made of exposed concrete, the facades are clad with horizontal larch wood slats.

Construction Data

- Minergie standard

- Wood frame construction


Services of Timbatec

- SIA Phase 31 Preliminary design

- Fire protection planning

- SIA Phase 32 Construction project

- Structural analysis and design

- SIA Phase 41 Tendering and comparison of offers

- 3D and 2D construction planning

- Technical site management and site inspections

Timberconstruction engineers
Timbatec Holzbauingenieure Schweiz AG, Thun
3600 Thun


Timber constructioncontractor
Hector Egger Holzbau AG
4900 Langenthal


Architect
Aebi&Vincent Architekten SIA AG
3007 Bern


Client
Ammann Globalbau
3652 Hilterfingen


Civil engineer
smt ag ingenieure + planer
3626 Hünibach bei Thun


Timber contractor
Frutiger AG Holzbau- und Raummodulbau
3661 Uetendorf


Building physicist
Zeugin Bauberatungen AG
3110 Münsingen



Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen