More and more large buildings are being built with timber as a renewable building material. Timbatec is a leading, innovative company in this growing future market. We construct multi-story buildings, industrial buildings and bridges in timber. And we develop modern timber construction products according to individual requirements.
The new Timbatec office in Delémont has started operations under the management of Johann Maître. The management symbolically handed over the office key to Johann this week and wishes him much success and exciting projects in French-speaking Switzerland. We are pleased we are now also represented in the French-speaking part of Switzerland.
The "Krokodil" residential building on the Sulzer site in Winterthur sets new standards for timber construction. Read more about the 6- to 8-story wooden building with 254 apartments in today's edition of the NZZ.
Timbatec has been committed to timber construction for over 20 years. Our vision is to build entire cities entirely from wood. In Thun, the first apartment building with a basement made of wood is currently under construction. We invite you to a virtual tour of the construction site in german on December 04, 2020 at 16:00.
On November 24, 2020 HC Ajoie played its first home game in the new ice stadium - built from hardwood and coniferous wood from the surrounding forests. We have more and more such exciting projects in the French-speaking part of Switzerland. That's why we're opening a new office in Delémont from the beginning of 2021 and are looking for motivated employees.
It took a long time to convince: Over 20 years ago Stefan Zöllig showed that wood is the right choice of building material for green bridges. Now it is built, the first wild animal bridge with a wooden roof. More will follow.
In Frenkendorf in Basel-Land, the first four-storey column-panel construction made of wood is being built. With the "Fasanenhof" apartment building with 15 apartments, TS3 technology proves its potential. The people involved are enthusiastic.
The new staff restaurant time out in the Cantonal Hospital Aarau was built in only eight months. The 3D planning and good project management enabled the fast construction time. ERNE as the general contractor and the planning team are in close cooperation with the client.
Properly planned wooden houses are comfortable and healthy to live in, and sound insulation is a high priority. A good example of this is the "sue und til" building complex in Winterthur with over 300 apartments. Their residents are very satisfied with the building acoustics.
The pedestrian and bicycle bridge Tüfi in Adliswil is aging. Analyses have shown that replacing the bridge is almost as expensive as an extensive renovation. Today the new bridge - with beech wood from the surrounding forests - was installed over the Sihl river.
The TS3 timber construction technology developed by Timbatec has made the breakthrough. Schilliger Holz is the first official CLT licensee. At an online event, the technology was explained and current projects were presented. Here you can find the recording of the event.
Switzerland:
Thun Branch
Timbatec Timber Construction Engineers Switzerland Ltd.
Niesenstrasse 1, 3600 Thun
Tel: +41 58 255 15 10
Zürich Branch
Timbatec Timber Construction Engineers Switzerland Ltd.
Ausstellungsstrasse 36, 8005 Zürich
Tel: +41 58 255 15 20
Delémont Branch
Timbatec Timber Construction Engineers Switzerland Ltd.
Avenue de la Gare 49, 2800 Delémont
+41 58 255 15 40
Bern Branch
Timbatec Timber Construction Engineers Switzerland Ltd.
Falkenplatz 1, 3012 Bern
Tel: +41 58 255 15 30
Austria:
Headquarters Vienna (A)
Timbatec Timber Construction Engineers GmbH
Im Werd 6/31a, 1020 Wien
Tel: +43 720 2733 01
Follow us: