New construction of Mosimann and Stromer Campus halls

10.06.2013

A timber construction company, a carpenter's workshop and a development and assembly plant for Stromer electric bikes were built here. The two symmetrically arranged halls are located on Freiburgstrasse in Oberwangen. The cubes with the dimensions 50x26x12 m characterize the landscape next to the highway.

New construction of Mosimann and Stromer Campus halls

The two symmetrically arranged halls are located on Freiburgstrasse in Oberwangen. The cubes with the dimensions 50x26x12 m characterize the landscape next to the highway. The two halls, most of which are two-storey, are connected by a roof, which is also used as a terrace. This leads to a visual connection and allows the eye to perceive the industrial buildings as a whole. In one of the halls, bicycle pioneer Thomas Binggeli and his 80 employees produce the E:Bike Stromer they developed themselves. In the other hall, wood is processed by two independent companies. Mosimann Holzbau and the carpentry firm Ringeisen, with their 40 employees, can use synergies in the new hall and thus make optimum use of the facilities. Mosimann Holzbau from Köniz acted as the client. This has been owned by Hector Egger Holzbau AG in Langenthal since 2005. Hector Egger Holzbau AG realized the construction project as general contractor.

Datenschutzhinweis

Diese Webseite nutzt externe Komponenten welche dazu genutzt werden können, Daten über Ihr Verhalten zu sammeln.

Notwendige Cookies werden immer geladen