Renovation and extension sports center, Gstaad

2018
Renovation and extension sports center
Renovation and extension sports center

Gstaad has made its sports center fit for the future. In addition to the construction of a wellness area, the wooden support structure of the indoor swimming pool was extensively renovated. Timbatec analyzed its condition and defined the renovation measures.

The project

The Gstaad indoor swimming pool, built in 1971, is the oldest indoor swimming pool in Switzerland with a three-hinged arch supporting structure made of glulam. The pool has been a listed building for some time. The dimensions of the construction are impressive. The supporting structure consists of three-hinged arch trusses with spans of up to 34.2 meters and cross sections between 20 x 110 cm and 35 x 135 cm. But age has left its mark. Building technology, the drains as well as the building structure were partly outdated. In addition, cracks had appeared in the main supporting structure of the roof. Timbatec received the order to investigate the cracks. They were recorded and documented with a total station. It was found that certain cracks were so deep that the statics were no longer guaranteed. It was also found that the load on the main girders was too high in some areas. Crack repair was therefore necessary on the girders. The cracks were cut free, cleaned and adhesive was injected to close them.

The construction method

In order to reinforce individual trusses, lamellas made of glulam were glued on. In addition, the roof was thermally renovated. The boarding between the trusses was removed, the roof was insulated from the inside and provided with a new formwork. Timbatec was responsible for quality assurance of the refurbishment work and also for fire protection for the entire project.

The challenge

The challenge was not to impair the appearance with its unmistakable character and to take care of the monument protection. At the same time as the refurbishment, the sports center was extended by a 1300 m2 new building with a wellness area. Guests will find fitness rooms as well as saunas, a steam bath and experience showers

Impressive dimensions: supporting structure of the indoor swimming poolImpressive dimensions: supporting structure of the indoor swimming pool
Between the trusses was renewed acoustic panelingBetween the trusses was renewed acoustic paneling
The beam on the far left is additionally reinforced with slatsThe beam on the far left is additionally reinforced with slats
Detailed view of a rehabilitated adhesive jointDetailed view of a rehabilitated adhesive joint
Project information
  • - Sanitized newly insulated roof area 1'650 m2
  • - Renovated adhesive joints on arch trussesr 125 m
Design stages
  • - SIA Phases 31 - 51
Design services
  • - Structural Engineering and Analysis
  • - Construction
  • - Fire protection
Additional Expertise
  • - Condition survey of supporting structure (crack detection and documentation with total station)
  • - Fire protection QSS2
  • - Technical Construction Management and Site Inspections
  • - Cost estimate
Client

Sportzentrum Gstaad AG3780 Gstaad

Architecture

K&L Architekten AG9012 St. Gallen

Timber construction

ARGE AnHaPeReuvA

Timber construction

Colin Karlen1660 Château-d’Oex

Site management

Germann Architektur AG3778 Schönried

Photography

Alexander Gemperle